PRODUCT DESCRIPTION

The standard is that the vertical members of the scaffolding are equipped with a socket (eight round or box type) for precise alignment. A series of "v" positioning ears are welded on the tube for connecting crossbeams and auxiliary components. Open standard and loose sockets are also available.

Material: q355/q235Surface treatment: black, hot-dip galvanized, electro-galvanized, powder sprayed.


PRODUCT FEATURES

Our cup-lock scaffolding system is mechanically welded with high-strength steel and the surface is hot-dip galvanized.

Each cup-lock scaffolding contains standard parts, horizontal parts, supports, slats, brackets, ladders, stairs, etc.

The cup-lock scaffolding is assembled into a "ring" shape using integral wedge connectors.

The cup-lock standard parts are the main components of the cup-lock scaffolding, made of Q345 steel and connected by connecting pins. Our cup-lock standard parts are available in two outer diameters: 48.3 mm (M48) and 60.3 mm (M60). The lengths include 500mm, 1000mm, 1500mm, 2000mm, 2500mm, 3000mm, etc., which can meet your different height requirements; the thicknesses include 3.0mm, 3.2mm, 3.25mm, etc., which can meet the needs of different projects.


ltemMaterialDiameterThicknessLengthSurface   Treatment
CUPLOCK STANDARD (VERTICAL)Q235/   Q355M48.3mm   / M60.3mm2.5mm-   4. 0mm500mmBlack,   Hot Dipped Galvanized, E-Galvanized, Powder Coating
1000mm
1500mm
2000mm
2500mm
3000mm





FAQ

Q : Can you send samples?
A : Of course, we can send samples to all parts of the world, our samples are free, but customers need to bear the courier costs.
Q : What product information do I need to provide?
A : You need to provide the grade, width, thickness, coating and the number of tons you need to purchase. 
Q : What are the shipping ports?
A : Under normal circumstances, we ship from Qingdao Tianjin, ports, you can choose other ports according to your needs. 
Q : How long does your delivery time take?
A : In general, our delivery time is within 30-45 days, and may be delayed if the demand is extremely large or special circumstances occur.

CONTACT US

Submit